Threadinq
Closed NONE

Guatemala - Hybrid Photovoltaic Solar System

Agency
STATE, DEPARTMENT OF
NAICS
238210
Place of performance
Guatemala, GT-GU
Closed
Jul 29, 2026
Posted
Jul 6, 2026

Description

The central aim of this acquisition initiative is the design and implementation of a hybrid solar system in the Office of Immigration Assistance located on the border of Valle Nuevo, Jutiapa, to guarantee operational continuity, energy efficiency and institutional sustainability in a strategic installation of the Government of Guatemala, that fulfill or exceed the requirements of the statement of work (SOW) detailed in this document. The office has an energy demand of approximately 3,000 kWh per month, mainly derived from computer systems, servers, lighting and administrative support equipment essential for immigration care and border control. Due to the critical nature of the operations carried out in this facility, it is essential to have a reliable energy system that allows services to be kept running during power outages, voltage variations or failures in the public grid. Border facilities are usually located in areas where the following may occur voltage variations, power outages, or instability of supply.

Track this market for the recompete

This opportunity has closed. Follow NAICS 238210 and we'll alert you when the follow-on contract posts.