Threadinq
Closed

Upgrade Generator Control System

Agency
STATE, DEPARTMENT OF
NAICS
22112
Place of performance
Vienna, AT-9
Closed
Jul 29, 2026
Posted
Jul 1, 2026

Description

The upgrade of the generator control system consists of, but is not limited to the following: Execution planning Decommissioning, Removal and disposal of existing generator control system Disconnection, removal and disposal of existing ACON Generator control system Delivery, installation and commissioning of new generator control system Delivery (HW & SW), installation and connection of new DSE 8620MKII (or equal) control system The Contractor guarantees spare parts availability (software and hardware components) for a minimum of 10 years. Commissioning, test run Customer training/documentation Under the contract the contractor assumes full and unlimited responsibility for the right choice and correct workmanship of flawless material as well as for proper and professional completion. Regulations/standards incl. electro- technical safety regulations: ÖNORM B 2110 General terms for construction work ETG 1992 electrical engineering law ÖVE/ÖNORM- E 8101 ÖVE/ÖNORM- E 8015-1-3 ÖVE/EN 1 DIN German industrial standards VDI guidelines Upgrade MTU 500kVA- Generator Control system- work must be scheduled for a weekend between Fr, 5pm until Su, 7pm. Generator downtime must be always kept to a minimum. Planned Execution period: Ocotober 2026

Track this market for the recompete

This opportunity has closed. Follow NAICS 22112 and we'll alert you when the follow-on contract posts.