Closed
SBA
Lenel & Milestone Maintenance Support Services for Security Cameras
- Agency
- DEPT OF DEFENSE
- NAICS
- 561621
- Place of performance
- Bethesda, MD
- Closed
- Jul 25, 2026
- Posted
- Jul 2, 2026
Description
7/1/2026 : The purpose of this amendment is to post answer to questions. Department of Defense Defense Health Agency Performance Work Statement Lenel & Milestone On-Site Maintenance Support Services Operations Department Walter Reed National Military Medical Center, Bethesda, Maryland Solicitation Number: Version: Date: ? PART 1 1.0 GENERAL INFORMATION 1.1 This is a non-personal services contract to provide Lenel & Milestone On-Site Maintenance Support Services for the Operations Department at Walter Reed National Military Medical Center (WRNMMC), Bethesda, MD. 1.2 Description of services/introduction: The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform as defined in this Performance Work Statement (PWS) except for those items specified as government furnished property and services. The contractor shall perform to the standards in this PWS. 1.3 Background: The OnGuard Access Control System (ACS) supports up to 32 doors or other access points and includes comprehensive event logging, notification and escalation. The ACS provides configurable system status and response actions such as system lockdowns. Detailed, credential-driven user records and access history are documented in pre-defined and custom reports. The System includes: • Web Interface • Blade Support • Solid-State Design • Video Integration • API Support • Automated System Management • Mobile App 1.3.1 Certification requirement: To ensure continuous, secure, and optimal performance of the physical security infrastructure at WRNMMC, technicians are required to hold certifications for both the ACS and the VMS. These certifications validate the technicians' proficiency in handling the complex configuration, installation, and daily maintenance of these integrated security platforms. For the OnGuard ACS, technicians must achieve and maintain the Lenel S2 OnGuard 8.2 Core Certification, primarily obtained through the Lenel Certified Associate (LCA) track. This training ensures technicians are fully capable of managing the backend architecture—such as database, Operating System, and SQL configurations—as well as the physical hardware and daily operational workflows like alarm monitoring and cardholder management. For the Milestone VMS, technicians must complete the Milestone Knowledge Program, specifically securing the Technical Configuration 1 and Technical Configuration 2 certifications. This multi-tiered certification ensures that technicians possess the advanced technical proficiency required to deploy, configure, and maintain highly complex video management installations across the enterprise network. 1.3.2 OnGuard ACS requirement Breakdown Requirement Area Detail Required Certification Lenel S2 OnGuard 8.2 Core Certification (Lenel Certified Associate – LCA track) Primary Objective Maintain technician proficiency to guarantee the uninterrupted operational status of the ACS systems at WRNMMC. System Maintenance Breakdown • Backend Infrastructure: Database and Operating System (OS) setup, alongside SQL server configuration. • Hardware Architecture: Installation, maintenance, and troubleshooting of access control panels and physical card readers. • Operational Systems: Management of alarm monitoring systems and administration of cardholder databases. 1.3.3 Milestone VMS requirement Breakdown Requirement Area Detail Required Certification Milestone Knowledge Program: Technical Configuration Level 1 & Technical Configuration Level 2 Primary Objective Validate technician expertise in the comprehensive installation, configuration, and maintenance of complex VMS environments. System Maintenance Breakdown • VMS Architecture: Installation and configuration of complex, enterprise-level VMS networks. • System Operations: Ongoing maintenance of recording servers, live video routing, and associated integrated camera infrastructure. 1.4 Objectives: T...
Track this market for the recompete
This opportunity has closed. Follow NAICS 561621 and we'll alert you when the follow-on contract posts.