Closed
SBA
GAOA South Park Office Rehab Pike National Forest
- NAICS
- 236220
- Place of performance
- Fairplay, CO
- Closed
- Jul 28, 2026
- Posted
- Jul 8, 2026
Description
Work for this project requires the contractor to be responsible for supplying all labor, materials, equipment, utilities, miscellaneous items, freight and delivery for the following: 1. Remove and install new standing seam metal roof; including underlayment, ridge vent, flashing, drip edge, roof curbs, crickets, gutters, and downspouts. 2. Install roof, valley, gutter, and downspout ice/snow melt system including electrical circuits. 3. Interior and exterior modifications including remove carpet and install carpet tiles, replace stained and damaged acoustical panels and ceiling tiles, and seal windows. Also, install new insulation in the areas where the ceiling is dropped. 4. Install additional communication outlets and electrical for telecom. 5. Install chain link fence, personnel gate, motorized gate, and associated electrical and safeties.
Track this market for the recompete
This opportunity has closed. Follow NAICS 236220 and we'll alert you when the follow-on contract posts.