Threadinq
Closed SBA

Mosquito Lake Control Tower Roof Replacement

Agency
DEPT OF DEFENSE
NAICS
238160
Place of performance
Cortland, OH
Closed
Aug 21, 2026
Posted
Aug 19, 2026

Description

This is a Presolicitation Notice only. This is not a Solicitation (Request for Quote). No purchase order will be issued from this announcement. Any applicable attachments for this project (i.e. Drawings) will be issued at the time of the Solicitation, not during this notice. This procurement is a 100% Small Business Set-Aside. All interested and capable offerors are encouraged to submit a quote. Project Description The U.S. Army Corps of Engineers (USACE), Pittsburgh District has a project that involves the complete replacement of the standing seam metal roof on the Control Tower Building at Mosquito Creek Lake in Cortland, Ohio. The work is to be completed within 365 calendar days after written Notice to Proceed (NTP). Rough Estimate of this non-commercial construction project is between $150,000.00 and $350,000.00. The work includes rerouting existing vent and exhaust pipes through the masonry side wall, installing a new gutter system, and integrating a new, certified, non-penetrating Lightning Protection System. Below are the major components of the work in more detail: Major Components of Work Demolition and Disposal: This phase requires the complete removal and legal disposal of the existing standing seam metal roof panels, box gutter, scuppers, and the old lightning protection system. All materials will be removed down to the underlying concrete roof slab. Structural Sub-Framing Refurbishment: The contractor must inspect all existing light-gauge, cold-formed metal sub-framing. Any framing members exhibiting visible deformation or a cross-sectional area loss of 25% or more due to corrosion must be replaced (up to 95 linear feet). All remaining sub-framing must be cleaned of surface rust by wire-brushing and finished with a suitable protective coating. Roof Deck Repair and Insulation: Before new insulation is applied, the existing concrete roof slab must be repaired, cleaned, and sealed. All repaired areas must pass a 24-hour flood test to verify they are watertight. Afterward, a closed-cell spray polyurethane foam insulation will be applied to achieve a minimum thermal resistance value of R-30. This installed foam must be protected from UV radiation and covered by the new roof deck within 72 hours. New Standing Seam Metal Roof System: A new, 22-gauge structural standing seam metal roof system will be designed, furnished, and installed. The panels will feature a high-performance 70% Polyvinylidene Fluoride (PVDF) finish. The new roof design will eliminate the previous box gutter, extend to cover that area, and incorporate new ridge and fascia ventilation. The installation must also include a new, custom-fabricated, ventilated peak cap. The contractor is responsible for all project submittals, including a Quality Control Plan, Accident Prevention Plan, and various shop drawings and product data for government approval. The manufacturer for the roofing system must have at least 10 years of experience, and the applicator must be certified by the manufacturer with at least 5 years of experience. Special Notice: Safety and Qualification Requirements Safety Compliance (EM 385-1-1): Quoters are advised that all work on this project must strictly comply with the latest edition of the U.S. Army Corps of Engineers (USACE) Safety and Health Requirements Manual (EM 385-1-1) (Link: https://www.publications.usace.army.mil/Portals/76/EM%20385-1-1%20_EFFECTIVE%2015March2024.pdf). Prior to commencing work, the contractor must submit and secure Government approval for a site-specific Accident Prevention Plan (APP), comprehensive Activity Hazard Analyses (AHAs), a formal Fall Protection Plan, and a professional Lift Plan detailing crane rigging and drop zones for hoisting materials to the 23-foot roof elevation. To enforce these standards, the contractor must employ a full-time, dedicated Level 1 Site Safety and Health Officer (SSHO) who must be present on-site at all times when work is in progress; the SSHO may also serve as the Quality Con...

Track this market for the recompete

This opportunity has closed. Follow NAICS 238160 and we'll alert you when the follow-on contract posts.