Threadinq
Closed

Santa Margarita River Levee System Erosion/Scour Protection Marine Corps Air Station Camp Pendleton, CA

Agency
DEPT OF DEFENSE
Closed
Jul 17, 2026
Posted
Jul 15, 2026

Description

SOURCES SOUGHT NOTICE: Santa Margarita River Levee SystemErosion/Scour ProtectionMarine Corps Air StationCamp Pendleton, CAW912PL26S0044This is a SOURCES SOUGHT announcement for market survey information only, it will be used by this agency for preliminary planning purposes. No contract will be awarded from this notice. No reimbursement will be made for any costs associated with providing information in response to this notice or any follow up information requests. (Respondents will not be notified of the results of the evaluation). The purpose of this Sources Sought Notice is to gain knowledge of the experience and qualification of the various members of the construction industry, including Large Business concerns, Small Business concerns, Hubzone, 8(a), Women-owned, Economically Disadvantage Women-owned, and Service Disabled Veteran owned firms. The Government strives to ensure that there is adequate competition among the potential pool of available contractors.The type of set-aside decision will depend upon the publics response to this notice.The Government is seeking to identify qualified sources either singularly or as part of an assembled team under North American Industry Classification System (NAICS) code 237990, Other Heavy and Civil Engineering Construction, which has a small business size standard of $45M.Project Description:The estimated construction price range for this project is between $50,000,000 and $100,000,000.00. The estimated total contract performance period is 1096 calendar days. Location of this work is Camp Pendleton, San Diego County, CAThe original levee was constructed in response to the 1993 flood that caused disastrous damages to infrastructure, aircraft, support equipment and suspended crucial national security Marine Corps aviation operations. The existing SMR Levee system was constructed between 1998 to 2001 as an emergency response after the 1998 flood event. Since construction completion of the levee system, maintenance of the levee and its appurtenances has been minimal. As a result, the waterside and some sections of the landside of the levee system exists with heavy vegetation and tree overgrowth that appears to impact the levee. The SMR levee system is approximately 3 miles long with 3 segments, i.e., West Segment, Air Station Segment, and East Segment, (Figure 1) and two project features, i.e., Floodwall and the Pump Station. The SMR levee system was constructed with 1:1 (Horizontal: Vertical) gradient embankment slopes comprised of either all soil-cement or a combination of geogrid reinforced earth and a soil cement shell on the riverside of the levee and crown. The Flood Wall project feature is a reinforced-concrete cantilevered retaining wall, approximately 21 feet high, and approximately 0.5 miles long. At the riverside of the levee, a stone revetment was placed at the toe of the embankment and flood wall to protect against erosion and scour. At the landside of the embankment, a toe berm was constructed and a subdrain system was installed at the toe. The levee is owned, operated, and maintained by MCAS Camp Pendleton. Proposed anticipated repairs to the Santa Margarita River System include the following: a) A levee raise to increase height about 2.5-4.5 feet vertical in the levee profile downstream of the Basilone Bridge and at the East Levee segment with soils Cement, this includes a stability berm approximately 3 feet vertical by 10 feet along at the east levee for about ~1100 feet long. A borrow site is identified about a mile away for soils cement use. It is anticipated that approximate 50K cubic yards of materials will be used for soil cement and general fill materials. An onsite soils cement batch plant will be required. b) Installation of several relief wells on the Air Station Segment. c) Replace and install a new toe drain and or abandoned existing toe drain along the interior of the levee system. d) Construct a graded gravel filter ditch at the landside of the Air Station...

Track this market for the recompete

This opportunity has closed. Follow NAICS and we'll alert you when the follow-on contract posts.