Closed
RWP - High Pressure Air System Expansion
- Agency
- DEPT OF DEFENSE
- Place of performance
- COOPERTOWN, TN
- Closed
- Jul 27, 2026
- Posted
- Jun 23, 2026
Description
The RWP due date has been extended to 10 July 2026. _______________________________________ Solicitation Number: RWP-HPASE-26-001 Project Title: High Pressure Air Storage Expansion (HPASE) Issuing Office: Air Force Test Center (AFTC)/PZIA, Arnold AFB, TN Authority: 10 U.S.C. § 4022, Other Transactions for Prototype (OTP) Projects 1. Overview The United States Air Force, on behalf of the Arnold Engineering Development Complex (AEDC) at Arnold AFB, TN, is soliciting white papers for a prototype project under the authority of 10 U.S.C. § 4022. The objective is to procure innovative solutions for the design, fabrication, installation, and commissioning of a High Pressure Air Storage Expansion (HPASE). This RWP is the first step in a multi-step solicitation process. The Government intends to award one or more Other Transaction (OT) for Prototype agreements resulting from this solicitation. Offerors are invited to submit a white paper of no more than 15 pages addressing their proposed technical and management approach. The Government will evaluate submitted white papers based on the criteria outlined in Section 7.0. Offerors who submit the most compelling solutions may be invited to submit a full proposal and engage in further discussions. The Government reserves the right to award a prototype agreement based on the initial white paper submission alone. Note: Interested parties must meet current NIST SP 800-171 and CMMC Level 2 (Self) certification requirements. For access to the protected requirements documents, contact the Agreements Officer(s) with your company’s CAGE code. NIST and CMMC certification will be confirmed before protected documents are sent via DoD SAFE. 2. Background High Pressure Air (HPA) is a critical utility for testing activities at AEDC. The existing HPA system has insufficient capacity to meet current and future testing demands, and its storage vessels are nearing the end of their service life. This project seeks to address these shortfalls by replacing existing storage vessels to extend the system's life and installing new storage vessels to increase overall HPA capacity. 3. Project Objectives & Definition of Success Definition of Prototype Success: Operational Utility Operational utility, within the Department of War, refers to the degree to which a system, weapon, technology, capability, or process contributes to the successful completion of military missions and objectives within the operational environment. It encompasses mission effectiveness, integration, logistics, cost effectiveness, and adaptability. A successful prototype project will be one that delivers a fully operational, integrated, and sustainable system(s). The primary objective is to deliver two new, independent, and fully functional HPA storage systems at AEDC. The scope includes all engineering, design, analysis, procurement, demolition of specified legacy components, fabrication, installation, inspection, and testing required for the systems. The new installations are expected to be generally consistent in form and function with the existing test facility installation (see Appendix F for reference), with the scaling as noted in the requirements documents. The solution must be installed at the specific locations identified in Appendix E and integrated with existing infrastructure at the designated tie-in points. 4. Key Performance Parameters The proposed prototype must satisfy, at a minimum, the following critical performance parameters (details may be found in the Performance Parameters and Appendices): Storage Capacity: Each location shall provide the following storage volumes: Location 1: 27,000 ft³ (±5%) Location 2: 6,800 ft³ (±5%) Operating Pressure: The HPA distribution system must be designed for a pressure of no less than 4,400 PSIG. Pressure Loss: The system shall induce no more than 50 PSID of pressure loss from any bottle's discharge to the connection point with the existing HPA distribution system. System Integration: The sol...
Track this market for the recompete
This opportunity has closed. Follow NAICS and we'll alert you when the follow-on contract posts.