Threadinq
Closed SBA

J--NWS HVAC PREVENTIVE MAINTENANCE (PM) WFO AND NEXRA

Agency
COMMERCE, DEPARTMENT OF
NAICS
811310
Closed
Aug 13, 2026
Posted
Aug 11, 2026

Description

AMENDMENT 0001 (08/11/2026): Add Q&A 1. Subcontractor Past Performance and Technical Experience Evaluation o Context: RFQ Section XII, provisions FAR 52.212-1 and 52.212-2, state that quotes must include at least two references from at least two separate contracts for similar and relevant recent services performed within the past two years to demonstrate capability. Under a prime-subcontractor teaming arrangement, a small business prime contractor manages administration, invoicing, and overall compliance, while a specialized local subcontractor performs physical, on-site technical services. o Question: Will the Government evaluate the past performance, technical experience, and HVAC certifications of proposed key subcontractors to satisfy the evaluation criteria under Technical Acceptability/Capability and Past Performance, provided the subcontractor is clearly identified and a signed teaming agreement or commitment letter is submitted with the quote? o Answer: Yes, subcontractor’s past performance is sufficient. 2. Pricing of Materials, Parts, and Specialty Equipment under Unscheduled Emergency Repair CLINs o Context: Section II, CLINs 0003 and 0004 (and Option Year equivalents) request a firm-fixed hourly rate for unscheduled emergency repairs. SOW Section 2.3.1 states that emergency repairs will include labor, parts, and components required to troubleshoot, diagnose, or repair faulty equipment, and that estimates must be submitted to the TPOC for review. SOW Section 7.0 further states that the contractor shall furnish all materials. o Question: Please clarify how replacement parts, materials, and specialty equipment required for unscheduled emergency repairs should be priced and invoiced under CLINs 0003 and 0004. Are offerors permitted to bill these parts at cost, or with a fixed material markup percentage? Alternatively, should offerors include a standard plug-in material allowance, or is the hourly rate intended to be fully burdened to cover labor only, with parts handled via separate post-award bilateral modifications? o Answer: Unscheduled emergency repairs will require estimates to be submitted to the TPOC for review and approval, using the labor rate provided in the RFP, and the pricing for the parts/components that need to be replaced. We presume the parts portion of the estimates will include a reasonable markup. 3. Specific Manufacturer Models, Types, and Quantities of Backup Batteries o Context: SOW Section 2.1.7 requires the contractor to inspect and replace backup batteries for HVAC controllers and Variable Frequency Drives (VFDs) annually. SOW Section 4.6 lists on-site equipment, including Trane UC600 Tracer Controls and Trane PM014 Power Supply Modules, but does not provide specifications or models for the on-site VFDs. o Question: To ensure accurate pricing of materials and avoid system disruptions, could the Government provide the specific manufacturer model numbers, battery types (e.g., lithium coin cells, sealed lead-acid modules), and total quantities of batteries requiring annual replacement for the VFDs and controllers at both the WFO and NEXRAD locations? o Answer: We do not have that information. This is likely a nominal cost. 4. Applicability of Service Contract Act (SCA) Wage Determinations o Context: Section X lists two separate Wage Determinations as contract attachments: Charleston WD 2015-4427 and Hampton WD 2015-4441. The places of performance consist of WFO Charleston (Charleston County) and NEXRAD Early Branch (Hampton County). o Question: Please confirm the geographic applicability of each Wage Determination. Is it the Government’s intent that WD 2015-4427 applies strictly to work performed at the Charleston WFO, and WD 2015-4441 applies strictly to work performed at the NEXRAD site in Early Branch? o Answer: Wage Determination is correct to the best of our knowledge. 5. Scope Clarification on Scheduled Consumables vs. Emergency Repair Parts o Context: SOW Section 2.1.5 and 2.1.6 mandate th...

Track this market for the recompete

This opportunity has closed. Follow NAICS 811310 and we'll alert you when the follow-on contract posts.